Polls

Rate Our Website
 
Dyke PRC House E-mail



Watch this presentation of a Dyke PRC home being rebuilt from start to finish. (Coming Soon!)

 

Additional information regarding Dorran PRC Houses.

 

Manufacturer
CLothed Concrete Construction Ltd
Designer
H G Dyke
Period Built
1940's
Number Built
600
Alternative Name  

Clothed Concrete Construction Dyke

 

 

Physical Attributes and Materials Used

 

  • 2-storey semi-detached houses. Medium pitch hipped roof covered with tiles.
    External walls of storey height PRC panels. First floor panels generally finished in darker aggregate oversail ground floor panels.
  • Foundation - concrete slab
  • External walls consist of PRC perimeter beams, bituminous felt connected with coach bolts and lined plasterboard.
  • Seperating wall contains lightweight PC block cavity wall.
  • Ceilings consist of staggered plasterboards.
  • Partitioned walls are timber stud lined with plasterboard.
  • Ground floor has timber boarding on timber joists on PRC perimeter beam.
  • First floor has tongue and groove or laminated boarding fixed by hooked straps to horizontal reinforcement within PRC ring beam.
  • Roof consists of timber joists, purlins and concrete tiles.

 

Areas which are defective

 

  • Cracking and spalling of PRC external wall components. 
  • Cast-in chlorides not present in panels, columns and main beams, but present in posts and secondary beams. 
  • Cracking of PRC posts.
  • Some posts of HAC concrete. 
  • Corrosion of RSA fixed to foundation plinth. 
  • Outward displacement of base of ground floor wall.

 

Environmental and Eco Ratings 
  • Original Insulation = F rated
  • PRC repaired High Density insulation = A Rated

Energy Effeciency

  • Original Heating = F rated
  • New Combi 97% effecient boilder heating (if installed) and a PRC repair = A rated